Distribution and Design Build: Speed to Market
White Paper
August 4, 2020

Distribution and Design Build: Speed to Market

Make-A-Wish and Dacon came together to build a boy’s dream of creating a virtual reality geodome for his school. The project caught the eye of Mortarr, the design inspiration website, winning the Do-Gooder award.

Read time: 3 minutes

This year, Greater Boston's warehouse and distribution sector grew 384.2%, delivering 2.3MSF of new space versus 475,000 SF in 2019 (Source: Colliers Boston Q2 Data). Driven by e-commerce adoption and localized inventory movement, investments in this sector fuel operational efficiency and competitive edge. This case study examines:

- Greater Boston's projected warehouse and distribution growth through 2025.

- How design build delivered a 46% time reduction across a $30MM distribution facility project.

- The realization of $1.7MM in savings. Expedition of 25 permits, saving 3 months of regulatory down time.

- Assured performance through collaboration, not competitive bidding.‍

Share:

More Insights and Resources

September 3, 2021

Dacon and Mass Electric Construction Company Collaborate on Headquarters Redesign in Waltham

View more
August 31, 2021

MEC Redesigns Waltham HQ

View more
July 30, 2021

cGMP: Building on Spec

View more
SubScribe

Intelligence by design

Sign up here to receive MATTER, our quarterly design build insights publication, by email.​​​

signup