Distribution and Design Build: Speed to Market
White Paper
August 4, 2020

Distribution and Design Build: Speed to Market

Read time: 3 minutes

‍

This year, Greater Boston's warehouse and distribution sector grew 384.2%, delivering 2.3MSF of new space versus 475,000 SF in 2019 (Source: Colliers Boston Q2 Data). Driven by e-commerce adoption and localized inventory movement, investments in this sector fuel operational efficiency and competitive edge. This case study examines:

- Greater Boston's projected warehouse and distribution growth through 2025.

- How design build delivered a 46% time reduction across a $30MM distribution facility project.

- The realization of $1.7MM in savings. Expedition of 25 permits, saving 3 months of regulatory down time.

- Assured performance through collaboration, not competitive bidding.‍

‍

More Insights and Resources

September 8, 2026

Dacon Corporation, indus, and VMD Companies Celebrate Major Construction Milestone with Cross Beam Signing Ceremony

View more
July 17, 2026

Dacon Wins Gold for Industrial Category Recognized by The Stevie Awards

View more
March 25, 2025

Shared Lab Operator Grows in Natick

View more